FLOW-TECH UNITED
info@flowtechunited.com.com
About us
We are one of the reputed Engineering, Procurement and Construction (EPC) company with capabilities in mechanical, structural, piping, pipeline, painting and coating disciplines and is currently executing projects in Oil, Gas & Petrochemicals, Power, Water and Wastewater sectors
Vision
Be one of the premier engineering, construction, and project management organization by achieving extraordinary results for our customers, building satisfying careers for our people, and earning a fair return on the value we deliver.
Mission
We ensure Construction-focused engineering and fit-to-purpose constructability at every step guarantee the best quality and cost-effective execution. Our model consists in managing the entire project lifecycle in direct execution throughout all phases.
PIPING
PREFABRICATIONWe work closely with clients to gain an understanding of yor desires both philosophical and practical.
How Can I Help You
Project include construction of the water transmission system from the Al Ashkara desalination plant to Al Sharqiya Province, including the supply and laying of a 312km water transmission pipelines, the construction of 17 water reservoirs, the construction and installation of 4 new pumping stations and the reinforcement of 3 existing pumping stations, and the supply and installation of chlorination system and control system
SCOPE OF WORK
SCOPE OF WORK
Dedicate the main SRCPP-Sur 48” pipeline for rich PDO gas from SNGP & SRCPP to feed rich gas consumers (e.g. Oman LNG & future SN-NGL plant), Dedicate the SNGP 48” loop line, and its new ~65 (approximate) km 48” pipeline to Oman LNG in Sur for lean gas (e.g. BP gas, NGLE residual gas) supplying non-LNG consumers (e.g. OMIFCO, Sur IPP, Al Kamil IPP, and SLIA). To Create gas quality/blending at GNH, where the two 48” pipeline meet and combine the lean & rich gas pipelines at new Sur GSS, and send the mix gas, using new launcher, to existing Oman LNG receiver.
Project includes the construction of 144 km and diameters ranging between about 600 and 1800 mm, the construction of six water pumping stations with a capacity ranging between about 1490 and 11900 m3/hour each, the construction of four reservoirs with a capacity ranging between about 5000 and 50000 m3 each. This also includes all civil, hydromechanical and electrical works, which cover the provision of electricity to the pumping stations, the provision and installation of equipment and supplies for the protection and operation of the water transmission lines, and the establishment of the necessary monitoring and control systems in the project facilities and their operations.
SCOPE OF WORK
Project include
1. Installation of 32-inch and 32.2km loop line from existing Pig receiver area at BVS-09 to BVS-10
2. Installation of 32-inch and 175.6km line from BVS-17 to Raysut termination point on the existing 24-inch south grid pipeline to Salalah including launcher and receiver traps
3. Installation of 20-inch gas supply line connection from Rabab header to the new 32-inch loop line downstream of BVS-18A
SCOPE OF WORK